7 thoughts on “Shortest Path – 2

  1. In part (e)
    The path A-X-N-B cannot be considered as shortest path. since after reaching X we have to go one step back horizontally to reach N. so, path A-X-N-B is taking a step more than the path A-N-X-B.
    Please correct me if I am wrong.

Leave a reply to catcracker Cancel reply